Skip to content
2026 Energy Alert: Utility costs are rising fast. Lock in your rate today →

Broken Arrow

Broken Arrow’s PSO Bill Is Going Up. Solar Locks It Down.

PSO approved a $119.5M rate increase in January 2025 and has a $597M rate review pending that could add another $25 per month. Solar plus battery storage locks in your energy cost before the next hike.

Your Utility

What Broken Arrow Homeowners Are Paying PSO

$119.5M

Rate increase approved

OCC approved Jan 2025

~$12

Monthly increase per home

Typical residential increase (1,100 kWh)

$597M

Rate review pending

Would add ~$25/month (~16% increase)

Local Solar

Why Broken Arrow Is a Smart City for Solar

Broken Arrow is the largest suburb in the Tulsa metro, served by PSO. PSO already approved a $119.5M rate increase in January 2025, and a massive $597M rate review is pending at the OCC. If approved, that would add roughly $25 per month to every residential bill, a 16% increase.

With 235+ sunny days per year and PSO's net metering program, solar panels in Broken Arrow produce real savings. A typical home with a $180 monthly PSO bill will pay over $46,000 to the utility over 15 years at current rate trends. Oklahoma rates are up 33.6% since 2020. A solar system pays for itself in 8-12 years, then produces free electricity for 13-17 more.

We handle every step: site assessment, system design, permitting with the City of Broken Arrow, PSO interconnection and final inspection.

115K+

Broken Arrow residents

Tulsa metro's largest suburb

8-12

Year cash payback

Then free electricity for 13-17 more years

4.1%

Home value increase

Zillow study, national average

How It Works

From Quote to Power in 5 Steps

01

Free Consultation

We review your PSO bills, assess your roof, and design a system sized to your actual usage. You leave with a clear proposal and timeline.

02

Custom Design

Our engineers design your system using satellite imagery and your energy data. You see exactly what you're getting before signing anything.

03

Permits & Approvals

We handle all City of Broken Arrow permits, HOA approvals, and PSO interconnection paperwork. You sign, we do the rest.

04

Installation

Most residential installs complete in 1-2 days. Our crews are backed by 50 years of construction heritage. 10-year workmanship warranty.

05

Activation

After final inspection and PSO meter swap, your system goes live. You start generating your own power and earning net metering credits.

See the Numbers

What Will You Pay PSO Over 15 Years?

Enter your monthly bill and see what you'll pay PSO over the next 15 years at current rate trends.

$

Ready to see what solar saves in Broken Arrow?

No obligation. We'll show you the numbers for your specific home and PSO usage.

Talk to Us

Common Questions

Broken Arrow Solar FAQ

How does net metering work with PSO? +
PSO's net metering program credits you for excess solar energy you send to the grid. When your panels produce more than your home uses (common during sunny afternoons), that energy flows to the grid and your meter effectively runs backward. You receive a bill credit at a blended rate that covers energy, fuel and purchased power charges (not the full retail rate, which also includes delivery and fixed fees). At the end of each billing cycle, you only pay for the net energy you consumed.
How will data centers affect my electric bill? +
Oklahoma has 18+ data centers under construction and 36+ already operating. PSO signed a single customer agreement for over 1,000 MW and has 11 additional contracts each 50+ MW. The $597M rate review pending at the OCC includes infrastructure costs driven partly by data center demand. Solar reduces your exposure to these pass-through charges.
What about Oklahoma hail and severe storms? +
We install Tier 1 panels rated to withstand 1-inch hail at 50+ mph. These panels are tested to IEC 61215 standards and built for climates like Oklahoma. Your panels are also covered under your homeowner's insurance.
Do I need a new roof before going solar? +
If your roof has less than 10 years of life remaining, we recommend replacing it first. We handle roofing and solar as one project, which saves you money and keeps everything under one warranty.
What's the payback period for solar in Broken Arrow? +
For a cash purchase, most Broken Arrow homeowners see payback in 8-12 years. After that, the electricity your system produces is essentially free for the remaining 13-17 years of panel life (panels carry 25+ year warranties). Financed systems typically have monthly payments that match or beat your current PSO bill from day one.
Do you handle permits and PSO paperwork? +
Yes. We handle every piece of paperwork: City of Broken Arrow building permits, structural engineering, PSO interconnection application and final inspection coordination. You sign the initial agreement and we manage the rest through activation.

Service Areas

We Also Serve

Let's Talk

Ready to Lock In Your Rate?

Straight answers, clear pricing, and a local team that installs what it sells.